夜夜躁狠狠躁日日躁-亚洲精品国产电影-日本高清www色视频-自拍偷在线精品自拍偷99

Hello! Welcome to Suzhou Anke Zhongda Purifying Technology Co.,ltd.! HOME | Add favorites | English | 中文版
PRODUCTS LISTS
CONTACT US
For more details, please consult
0512-68249823
0512-68240292-812
13951112621
CONTACT:Mr zhang
Or leave a message for us
NewsLOCATION:HOME >News
How to use air shower passage and precautions
 Hits:7790 AddTime:2021/3/11 17:21:18
How to use the air shower channel and precautions:
1. The air shower must be able to be used under the premise of good commissioning and operation, and the surrounding environment must be cleaned before use. It is better to use a vacuum cleaner to absorb the dust in the air shower channel area.
2. Turn on the power before use, and the red indicator light will be on. When the personnel enter the air shower room, close the door, and then the air shower fan will blow. When the time is set, the fan will stop automatically, and then the personnel can leave the air shower room and enter the production workshop.
3. In the air shower area, it is strictly forbidden to pile up sundries and bring in articles that are easy to cause dust and pollution.
4. When workers enter the air shower room, they should change their clothes, shoes and hats to reduce the dust content in the environment.
Air shower maintenance channel:
1. Air shower and medium efficiency air filter need to be replaced frequently due to the influence of environment. Medium efficiency air filter is the first filter used as high efficiency filter. Frequent replacement of medium efficiency air filter can reduce the load of high efficiency filter and prolong its service life, which is beneficial to improve air purification efficiency. When replacing, remove the front orifice plate, take out the filter material and replace it.
2. After a long time of efficient use, the dust accumulation increases, the resistance increases, and the wind speed decelerates (generally for one year), so it has to be replaced. When replacing, remove the medium efficiency air filter and loosen the nut of the high efficiency filter to remove the high efficiency filter.
3. Pay attention to the air flow direction when installing the high efficiency filter. The sponge side is the air outlet side. Pay attention to the flatness when installing the filter. The frame of the filter should be well sealed with the chassis, and no leakage is allowed.
4. When the fan breaks down, remove the medium efficiency filter to overhaul the fan.
5. The electrical part is equipped with electrical control panel or electrical control box. In case of failure, the wiring board can be overhauled by opening the manhole.
6. Shj-fl air shower is equipped with an access hole for other maintenance, and the access hole is set under the passage.
【Refresh】【Favorites】【Print】 【Close】
Previous:How to purchase a return air grille Next:The role of purifying air conditioning

主站蜘蛛池模板: 久久zyz资源站无码中文动漫| 成全电影在线观看免费观看国语| 久久午夜福利无码1000合集| 熟妇人妻无码中文字幕老熟妇| 无码不卡中文字幕av| 亚洲精品乱码久久久久久v| 无码精品尤物一区二区三区 | 国产成人无码综合亚洲日韩| 午夜肉伦伦影院| 大肉大捧一进一出好爽视频mba| 97人人模人人爽人人少妇| 香蕉久久夜色精品升级完成| 色播久久人人爽人人爽人人片av| 久久99精品久久久大学生| 男人狂桶女人出白浆免费视频 | 欧美性猛交xxxx乱大交极品| 亚州日本乱码一区二区三区| 亚洲精品国产电影| 疯狂做受xxxx欧美老人| 国产成人精品a视频| 国产偷窥女洗浴在线观看| 国产成人手机高清在线观看网站| 性一交一乱一伦一色一情孩交 | 久久精品a亚洲国产v高清不卡| 成人aaa片一区国产精品| 久久夜色精品国产噜噜麻豆| 国产乱妇无乱码大黄aa片| 欧美老熟妇乱大交xxxxx| 日本一区二区在线播放| 在线观看无码av网站永久免费 | 欧美人与动性xxxxx杂性| 日本丰满熟妇bbxbbxhd| 国产精品十八禁在线观看| 国产激情无码一区二区三区| 亚洲欧美一区二区三区| 黄色视频在线免费观看| 国产精品v片在线观看不卡| 亚洲中文字幕无码久久2017| 亚洲区小说区图片区qvod| 大胸校花莹莹被老头糟蹋| 久久精品国产亚洲av四虎|