夜夜躁狠狠躁日日躁-亚洲精品国产电影-日本高清www色视频-自拍偷在线精品自拍偷99

Hello! Welcome to Suzhou Anke Zhongda Purifying Technology Co.,ltd.! HOME | Add favorites | English | 中文版
PRODUCTS LISTS
CONTACT US
For more details, please consult
0512-68249823
0512-68240292-812
13951112621
CONTACT:Mr zhang
Or leave a message for us
NewsLOCATION:HOME >News
How to purchase a return air grille
 Hits:4806 AddTime:2023/6/15 17:39:52
The selection of sewage treatment equipment grids includes the selection of grid section, determination of grid spacing, and selection of grid slag removal methods. The cross-sectional shapes of grid bars include squares, circles, rectangles, and rectangles with semicircles. Circular cross-section bars have good hydraulic conditions, low water flow resistance, but poor stiffness, and generally use rectangular bars. The cross-sectional shape of the grid bars can be selected according to the following table.
Determination of grid bar spacing
1. The clearance of the front grille of the water pump is determined according to the requirements of the water pump. (Refer to P178 Table 6-3 of the teaching material)
2. The determination of the spacing between the front grille of the sewage treatment system is generally as follows: manual slag removal: 25-40mm; Mechanical slag removal: 10-25mm.
3. Determination of slag amount: For domestic sewage, if there is a lack of information, it can be determined according to Table 6-4 of the textbook.
Determination of Design Parameters for Grating of Sewage Treatment Equipment
1. The flow rate of sewage in front of the fence is 0.4-0.9m/s;
2. Flow velocity through the grid: 0.6-1.0m/s;
3. The height difference h1 (head loss) between the bottom of the channel before and after the gate is generally taken as 0.08-0.15m;
4. Grid inclination angle: 45 °~75 °
Operation and Maintenance
For manual slag removal grilles: promptly remove and prevent blockage.
For mechanical slag removal grilles: ensure normal operation. Intermittent cleaning should be equipped with overload automatic protection devices.
Regular inspection and maintenance of all parts of the equipment are required, and maintenance records should be kept.
【Refresh】【Favorites】【Print】 【Close】
Previous:Design Techniques for Lighting System Configuration in Purification Workshop Next:How to use air shower passage and precautions

主站蜘蛛池模板: 国产国产国产国产系列| 一本久道久久综合狠狠爱| 亚洲成aⅴ人片久青草影院| 无码天堂亚洲国产av| 日本午夜精品理论片a级app发布| 丰满岳妇乱一区二区三区| 永久黄网站色视频免费观看| 一色屋精品视频在线观看| 国产成人av片免费| 亚洲日韩一区二区三区| 丝袜 亚洲 另类 欧美 变态| 天天摸天天透天天添| 亚洲国产精品尤物yw在线观看| 无码少妇一区二区性色av| 人妻有码中文字幕在线| 欧美成人看片黄a免费看| 亚洲熟妇无码乱子av电影| 狠狠躁天天躁日日躁欧美| 亚洲av成人网| 国产va免费精品观看精品| 色婷婷一区二区三区四区成人网| 中文字幕乱人伦视频在线| 午夜无码国产理论在线| 亚洲va中文在线播放免费| 性色欲情网站| 少妇厨房愉情理伦片bd在线观看| 欧美性猛交内射兽交老熟妇| 天天影视色香欲综合久久| 日本高清不卡aⅴ免费网站| 国产香蕉国产精品偷在线| 色五月激情五月| 亚洲成a人v欧美综合天堂下载| 欧美性巨大╳╳╳╳╳高跟鞋| 香港三日本三级少妇三级2021| 人人玩人人添人人澡东莞| 日日av拍夜夜添久久免费 | 成人天堂资源www在线| 露脸内射熟女--69xx| 国产成人亚洲综合无码精品 | 欧美黑人激情性久久| 国产熟女乱子视频正在播放|