夜夜躁狠狠躁日日躁-亚洲精品国产电影-日本高清www色视频-自拍偷在线精品自拍偷99

Hello! Welcome to Suzhou Anke Zhongda Purifying Technology Co.,ltd.! HOME | Add favorites | English | 中文版
PRODUCTS LISTS
CONTACT US
For more details, please consult
0512-68249823
0512-68240292-812
13951112621
CONTACT:Mr zhang
Or leave a message for us
NewsLOCATION:HOME >News
How to purchase a return air grille
 Hits:4801 AddTime:2023/6/15 17:39:52
The selection of sewage treatment equipment grids includes the selection of grid section, determination of grid spacing, and selection of grid slag removal methods. The cross-sectional shapes of grid bars include squares, circles, rectangles, and rectangles with semicircles. Circular cross-section bars have good hydraulic conditions, low water flow resistance, but poor stiffness, and generally use rectangular bars. The cross-sectional shape of the grid bars can be selected according to the following table.
Determination of grid bar spacing
1. The clearance of the front grille of the water pump is determined according to the requirements of the water pump. (Refer to P178 Table 6-3 of the teaching material)
2. The determination of the spacing between the front grille of the sewage treatment system is generally as follows: manual slag removal: 25-40mm; Mechanical slag removal: 10-25mm.
3. Determination of slag amount: For domestic sewage, if there is a lack of information, it can be determined according to Table 6-4 of the textbook.
Determination of Design Parameters for Grating of Sewage Treatment Equipment
1. The flow rate of sewage in front of the fence is 0.4-0.9m/s;
2. Flow velocity through the grid: 0.6-1.0m/s;
3. The height difference h1 (head loss) between the bottom of the channel before and after the gate is generally taken as 0.08-0.15m;
4. Grid inclination angle: 45 °~75 °
Operation and Maintenance
For manual slag removal grilles: promptly remove and prevent blockage.
For mechanical slag removal grilles: ensure normal operation. Intermittent cleaning should be equipped with overload automatic protection devices.
Regular inspection and maintenance of all parts of the equipment are required, and maintenance records should be kept.
【Refresh】【Favorites】【Print】 【Close】
Previous:Design Techniques for Lighting System Configuration in Purification Workshop Next:How to use air shower passage and precautions

主站蜘蛛池模板: 性一交一乱一色一视频| 国产精品电影一区二区在线播放| 偷偷做久久久久网站| 亚洲和欧洲一码二码区别7777 | 国产精品久久久久久亚洲影视| 免费夜色污私人影院在线观看| 中文无码av一区二区三区| 国产精品毛片一区二区三区| 国产果冻豆传媒麻婆| 最近免费中文字幕大全免费版视频| 五月色婷婷丁香无码三级| 国偷自产视频一区二区久| 亚洲精品成人久久久| 欧美黑人又大又粗xxxxx| а∨天堂一区一本到| 国产午夜精品理论片| 国产内射合集颜射| 成全高清免费观看方法 | 国产成人午夜无码电影在线观看| 娇妻玩4p被三个男人伺候电影| 小蜜被两老头吸奶头在线观看| 日韩人妻无码一区二区三区99| 亚洲精品无码不卡在线播放| 人人玩人人添人人澡东莞| 亚洲熟伦熟女新五十路熟妇 | 亚洲爆乳大丰满无码专区 | 亚洲av无码1区2区久久| 色窝窝免费播放视频在线| 亚洲av永久无码精品水牛影视| 成人欧美一区二区三区1314| 真人一对一免费视频| av无码国产精品色午夜| 亚洲av成人无码久久精品| 国产乱码精品一区二区三区四川人| 日韩精品人妻系列无码专区| 国产女主播白浆在线看| 波多野结衣一区二区三区高清av| 性少妇freesexvideos高清| 精品国模一区二区三区| 无码人妻久久一区二区三区免费 | 久久精品国产99国产精品|